Mission 01 / frame the event

Define the fault. Surface the proof gap.

Set the grid envelope, installed control base, and data provenance that the comparison must hold constant.

Scenario configuration

Grid event inputs

Define the scenario a ShiftNode demo twin will use to compare baseline response against a modeled upgraded response.

Data & scenario layer

Import plant data

Local only

Upload CSV/XLSX project data to populate the model inputs. Files are parsed in this browser session and are not uploaded, stored, or sent to a backend.

Scenario library

Buyer-grade stress cases

General parameters

Project Phase

Choose where this site is in its engineering or retrofit workflow.

0% inertia-heavy100% high inverter share

Engineering inputs

1.5 very weak10.0 strong

Fault ride-through envelope

0% solid fault50% distant fault
100 ms fast500 ms delayed